QuickTakeoff use cases by industry
In government and private tenders alike, the buyer publishes an RFP with 2D drawings, specifications and the quantities or scope of items to be built. The bidder must verify those quantities, convert them into a BOM and BOQ, and price them. Here is how that plays out in each industry QuickBid serves.
EPC and turnkey tenders bundle engineering, procurement and construction into one lump-sum or item-rate bid, so the bidder carries the quantity risk. The tender pack typically includes general arrangement drawings, structural drawings, piping layouts and equipment data sheets.
- Items to be fabricated: structural steel frames and pipe racks, platforms and ladders, storage tanks, skids, chutes and hoppers, and piping spools.
- BOM and BOQ lines: plate and section weights by grade, pipe lengths by schedule, flanges, fittings, fasteners, welding consumables, painting area, and fabrication man-hours.
- Where QuickTakeoff helps: drawing analysis and 3D modelling let the estimator verify the buyer's furnished quantities across disciplines, while material optimisation shows how much plate and section stock the job really consumes after cutting and nesting.
Architecture, engineering and construction (AEC) and consultancy tenders are drawing-heavy. MEP packages in particular combine HVAC, plumbing, fire-fighting and electrical drawings on many sheets, and each needs its own takeoff.
- Items to be fabricated: HVAC ducting (rectangular and spiral, with elbows, tees, reducers and dampers), cable trays, GI and MS pipework, support hangers and brackets, and AHU and plenum casings.
- BOM and BOQ lines: sheet metal area and gauge for ducts, duct insulation area, flange angles, hanger rods, cable tray length by width, and pipe length by diameter.
- Where QuickTakeoff helps: an MEP takeoff from 2D ducting drawings is slow because every run, fitting and gauge must be counted. Reading the drawings, modelling them in 3D and generating the takeoff directly reduces manual counting, and sheet nesting reduces scrap on duct fabrication.
Oil and gas buyers issue tenders with detailed fabrication drawings and datasheets for pressure-containing equipment. Details such as shell thickness, nozzle schedules and design codes are specified by the buyer, and the bidder must price them accurately.
- Items to be fabricated: pressure vessels, separators and knock-out drums, heat exchangers (shell and tube), storage tanks, piping spools, manifolds, skids and pig launchers and receivers.
- BOM and BOQ lines: shell and head plate by grade and thickness, nozzles and flanges by rating, tubes and tubesheets, saddles and supports, internals, welding length, NDT and hydro-test allowances, and surface treatment.
- Where QuickTakeoff helps: a vessel or exchanger drawing becomes a 3D model, from which plate, forgings and fittings are extracted. Material optimisation matters here because expensive alloy plate can be nested to cut waste before the bid price is fixed.
Refinery and petrochemical projects tender process equipment and large fabricated assemblies, often with tight material specifications for high-temperature or corrosive service.
- Items to be fabricated: columns and towers with trays, fired heaters and furnace structures, reactors, air-cooled heat exchangers, process piping, flare stacks, and tank farm components.
- BOM and BOQ lines: clad or alloy plate, tray assemblies, tube bundles, refractory lining area, piping by material class, structural steel for supports, and insulation quantities.
- Where QuickTakeoff helps: assemblies with many components, such as a column with trays and nozzles, are easier to quantify from an interactive 3D model than from a stack of sheets, and structured BOQ output keeps bids for large refinery packages consistent.
Automation tenders come with P&ID drawings, instrument index, I/O lists, panel layouts and cable schedules. The fabricated and bought-out content is large, and a missed cable run or panel is expensive.
- Items to be fabricated: control and marshalling panels, PLC and DCS cabinets, junction boxes, instrument stands, cable trays and ladders, and local control stations.
- BOM and BOQ lines: panel enclosures by size, instruments by tag, cable length by type and core size, glands and lugs, trays and supports, and engineering and commissioning effort.
- Where QuickTakeoff helps: structured material takeoffs from layouts and schedules, and cost estimation across materials, labour and fabrication, give automation bidders a more consistent basis for DCS, PLC and SCADA pricing.
Power sector buyers, including utilities and public sector units, tender for generation, transmission and distribution work with detailed drawings for structures, foundations and equipment.
- Items to be fabricated: transmission line towers and angles, substation structures, switchyard gantries, boiler pressure parts and ducts, ESP and chimney components, cable trays, and transformer tanks and radiators.
- BOM and BOQ lines: galvanised angle and plate tonnage by member, bolts and nuts, hardware and fittings, cable by voltage class, earthing material, and galvanising and painting allowances.
- Where QuickTakeoff helps: repetitive structures such as towers contain thousands of members. Automated drawing analysis, takeoff and optimisation help bidders reduce counting effort and plan cut lengths to reduce scrap.
Government and private infrastructure tenders for roads, bridges, buildings, water and industrial plants come with construction drawings, specifications and a schedule of quantities, usually priced against rate schedules such as CPWD DSR.
- Items to be fabricated: structural steel for bridges and buildings, reinforcement cages, embedded plates, steel stairs and railings, ducting and pipework, and precast or formwork components.
- BOM and BOQ lines: reinforcement by bar diameter (with a bar bending schedule), structural steel tonnage, concrete volume, formwork area, and finishing and MEP items.
- Where QuickTakeoff helps: construction drawing takeoff is repetitive and error-prone. Generating quantities directly from drawings and the 3D model, then pricing them across cost heads, speeds up BOQ preparation before the tender deadline.
One pattern across all seven industries
Whatever the sector, the workflow is the same: the buyer furnishes drawings and specifications, the bidder derives a BOM and BOQ, optimises material use, and prices every cost head. That repeatable pattern is what QuickTakeoff is designed to speed up.