Every tender starts the same way: the buyer publishes an RFP with 2D drawings, specifications and a list of items to be built, and the bidder has a short window to turn all of it into a priced offer. The slowest step is the quantity takeoff, where an estimator reads each drawing, counts components, measures lengths and areas, and builds the bill of quantities (BOQ) and bill of materials (BOM) by hand.

QuickTakeoff is an upcoming AI quantity takeoff software from QuickBid, built for Indian bidders. It reads engineering drawings, builds interactive 3D models, generates material takeoffs, optimises material use and produces cost estimates across every relevant cost head. This article explains how it works and where it fits across seven tender-driven industries, from EPC contracts to HVAC ducting.

Why manual quantity takeoff holds bidders back

Bidders spend significant time interpreting engineering drawings and calculating material quantities, labour, wastage, fabrication and other project costs. In practice that means a manual PDF drawing takeoff, or an AutoCAD quantity takeoff, plus rate analysis against schedules such as CPWD DSR rates, a bar bending schedule for reinforcement, or an MEP takeoff where the job calls for it.

The cost of this approach shows up in three places:

  • Time: a large tender package can run to hundreds of drawing sheets, and the bid deadline does not move.
  • Accuracy: a missed flange, a mis-measured duct run or a wrong plate size flows straight into the bid price.
  • Wastage: quantities are often counted as drawn, without planning how raw material will actually be cut and nested.

The result is that bid teams either spend days on takeoff and bid on fewer tenders, or rush the work and carry pricing risk.

01

What is QuickTakeoff? From drawing to estimate

QuickTakeoff is BOQ software and BOM software in one flow. A bidder uploads the buyer's 2D drawings, and the software works through four steps toward a bid price.

  1. 2D drawing: add the engineering drawings that came with the tender.
  2. 3D model: the software reads the drawings and builds an interactive 3D model of the parts, assemblies and components.
  3. Optimise and quantify: material takeoffs are generated and material use is optimised to cut scrap and wastage.
  4. Cost and price: the BOQ gives the bid team an estimate across every cost head, so they can price with confidence.

The six core features

FeatureWhat it does for the bid team
Drawing analysisReads 2D engineering drawings to understand what needs to be built, the first step of an AI quantity takeoff, with far less manual interpretation.
3D modellingTurns 2D drawings into interactive 3D models so parts, assemblies and dimensions can be inspected in depth.
Material takeoffGenerates material takeoffs and quantities directly from the drawings and the 3D model.
Material optimisationEstimates the material you actually need and plans cutting and nesting to keep scrap and wastage low.
Cost estimationPrices every cost head from structured, optimised quantities.
BOQ and BOM generationProduces structured bills of quantities and materials, ready for BOQ preparation and tender pricing.

Cost heads covered

QuickTakeoff estimates raw materials, labour, scrap and wastage, manufacturing, fabrication and other project costs, so the price reflects the full cost of delivering the work and not only the steel or cable on the drawing.

QuickTakeoff is in development and is currently listed as coming soon, with an early-access list open for bid teams.

02

QuickTakeoff use cases by industry

In government and private tenders alike, the buyer publishes an RFP with 2D drawings, specifications and the quantities or scope of items to be built. The bidder must verify those quantities, convert them into a BOM and BOQ, and price them. Here is how that plays out in each industry QuickBid serves.

1. EPC, turnkey and infrastructure contracts

EPC and turnkey tenders bundle engineering, procurement and construction into one lump-sum or item-rate bid, so the bidder carries the quantity risk. The tender pack typically includes general arrangement drawings, structural drawings, piping layouts and equipment data sheets.

  • Items to be fabricated: structural steel frames and pipe racks, platforms and ladders, storage tanks, skids, chutes and hoppers, and piping spools.
  • BOM and BOQ lines: plate and section weights by grade, pipe lengths by schedule, flanges, fittings, fasteners, welding consumables, painting area, and fabrication man-hours.
  • Where QuickTakeoff helps: drawing analysis and 3D modelling let the estimator verify the buyer's furnished quantities across disciplines, while material optimisation shows how much plate and section stock the job really consumes after cutting and nesting.

2. AEC, consultancy and MEP drawings

Architecture, engineering and construction (AEC) and consultancy tenders are drawing-heavy. MEP packages in particular combine HVAC, plumbing, fire-fighting and electrical drawings on many sheets, and each needs its own takeoff.

  • Items to be fabricated: HVAC ducting (rectangular and spiral, with elbows, tees, reducers and dampers), cable trays, GI and MS pipework, support hangers and brackets, and AHU and plenum casings.
  • BOM and BOQ lines: sheet metal area and gauge for ducts, duct insulation area, flange angles, hanger rods, cable tray length by width, and pipe length by diameter.
  • Where QuickTakeoff helps: an MEP takeoff from 2D ducting drawings is slow because every run, fitting and gauge must be counted. Reading the drawings, modelling them in 3D and generating the takeoff directly reduces manual counting, and sheet nesting reduces scrap on duct fabrication.

3. Oil and gas

Oil and gas buyers issue tenders with detailed fabrication drawings and datasheets for pressure-containing equipment. Details such as shell thickness, nozzle schedules and design codes are specified by the buyer, and the bidder must price them accurately.

  • Items to be fabricated: pressure vessels, separators and knock-out drums, heat exchangers (shell and tube), storage tanks, piping spools, manifolds, skids and pig launchers and receivers.
  • BOM and BOQ lines: shell and head plate by grade and thickness, nozzles and flanges by rating, tubes and tubesheets, saddles and supports, internals, welding length, NDT and hydro-test allowances, and surface treatment.
  • Where QuickTakeoff helps: a vessel or exchanger drawing becomes a 3D model, from which plate, forgings and fittings are extracted. Material optimisation matters here because expensive alloy plate can be nested to cut waste before the bid price is fixed.

4. Petroleum and refining: process equipment and refineries

Refinery and petrochemical projects tender process equipment and large fabricated assemblies, often with tight material specifications for high-temperature or corrosive service.

  • Items to be fabricated: columns and towers with trays, fired heaters and furnace structures, reactors, air-cooled heat exchangers, process piping, flare stacks, and tank farm components.
  • BOM and BOQ lines: clad or alloy plate, tray assemblies, tube bundles, refractory lining area, piping by material class, structural steel for supports, and insulation quantities.
  • Where QuickTakeoff helps: assemblies with many components, such as a column with trays and nozzles, are easier to quantify from an interactive 3D model than from a stack of sheets, and structured BOQ output keeps bids for large refinery packages consistent.

5. APC and industrial automation: DCS, PLC and SCADA projects

Automation tenders come with P&ID drawings, instrument index, I/O lists, panel layouts and cable schedules. The fabricated and bought-out content is large, and a missed cable run or panel is expensive.

  • Items to be fabricated: control and marshalling panels, PLC and DCS cabinets, junction boxes, instrument stands, cable trays and ladders, and local control stations.
  • BOM and BOQ lines: panel enclosures by size, instruments by tag, cable length by type and core size, glands and lugs, trays and supports, and engineering and commissioning effort.
  • Where QuickTakeoff helps: structured material takeoffs from layouts and schedules, and cost estimation across materials, labour and fabrication, give automation bidders a more consistent basis for DCS, PLC and SCADA pricing.

6. Power and energy: generation to grid distribution

Power sector buyers, including utilities and public sector units, tender for generation, transmission and distribution work with detailed drawings for structures, foundations and equipment.

  • Items to be fabricated: transmission line towers and angles, substation structures, switchyard gantries, boiler pressure parts and ducts, ESP and chimney components, cable trays, and transformer tanks and radiators.
  • BOM and BOQ lines: galvanised angle and plate tonnage by member, bolts and nuts, hardware and fittings, cable by voltage class, earthing material, and galvanising and painting allowances.
  • Where QuickTakeoff helps: repetitive structures such as towers contain thousands of members. Automated drawing analysis, takeoff and optimisation help bidders reduce counting effort and plan cut lengths to reduce scrap.

7. Infrastructure and construction

Government and private infrastructure tenders for roads, bridges, buildings, water and industrial plants come with construction drawings, specifications and a schedule of quantities, usually priced against rate schedules such as CPWD DSR.

  • Items to be fabricated: structural steel for bridges and buildings, reinforcement cages, embedded plates, steel stairs and railings, ducting and pipework, and precast or formwork components.
  • BOM and BOQ lines: reinforcement by bar diameter (with a bar bending schedule), structural steel tonnage, concrete volume, formwork area, and finishing and MEP items.
  • Where QuickTakeoff helps: construction drawing takeoff is repetitive and error-prone. Generating quantities directly from drawings and the 3D model, then pricing them across cost heads, speeds up BOQ preparation before the tender deadline.

One pattern across all seven industries

Whatever the sector, the workflow is the same: the buyer furnishes drawings and specifications, the bidder derives a BOM and BOQ, optimises material use, and prices every cost head. That repeatable pattern is what QuickTakeoff is designed to speed up.

03

Benefits for tender and estimation teams

Turning complex drawings into structured quantities and cost estimates helps bidders work faster, improve estimation accuracy, reduce manual effort and make better-informed bid pricing decisions.

  • Faster bid turnaround: less time reading drawings and counting by hand means more tenders can be evaluated before each deadline.
  • More consistent BOQs: structured BOM and BOQ output gives every estimator the same format and reduces missed items.
  • Lower material cost: nesting and cutting plans surface scrap and wastage before the price is submitted.
  • Complete cost view: raw materials, labour, scrap and wastage, manufacturing, fabrication and other project costs sit in one estimate.
  • Better bid or no-bid decisions: a quicker, clearer cost picture helps teams decide where to spend effort.
04

Get early access to QuickTakeoff

QuickTakeoff is in development. Join the early-access list to hear the moment it is ready. As an early-access member you get to:

  • Be first to know when QuickTakeoff is available.
  • Try the quantity takeoff software on your own drawings.
  • Have a say in what gets built.

To talk to the team, call +91 9112567888 or email support@quickbid.co.in. You can also visit QuickBid to book a demo of the wider platform.

05

Frequently asked questions

What is QuickTakeoff?

QuickTakeoff is upcoming AI quantity takeoff software from QuickBid for India's bidders. It reads 2D engineering drawings, builds interactive 3D models, generates material takeoffs, optimises material use and produces cost estimates and BOQs for tender pricing.

What is a quantity takeoff in tendering?

A quantity takeoff is the process of measuring and counting the materials and components shown in drawings, such as plate, pipe, ducting, cable or reinforcement. It is the basis for the bill of quantities and the cost estimate in a tender bid.

What is the difference between a BOM and a BOQ?

A bill of materials (BOM) lists the materials and components needed to build an item, such as a pressure vessel. A bill of quantities (BOQ) lists work items with quantities, so they can be priced in a tender. Bidders often prepare both from the same drawings.

How does AI quantity takeoff software work?

The software reads the 2D drawings, recognises what must be built, models parts and assemblies in 3D, and generates material quantities from that model. QuickTakeoff then optimises material use and prices the quantities across cost heads.

Can QuickTakeoff create a BOQ from 2D drawings?

Yes, that is its purpose. It turns the 2D drawings furnished with a tender into structured bills of quantities and materials, ready for BOQ preparation and tender pricing.

Which industries is QuickTakeoff built for?

QuickTakeoff is built for EPC and turnkey contracts, AEC and MEP consultancy, oil and gas, petroleum and refining, APC and industrial automation, power and energy, and infrastructure and construction tenders.

Can it handle fabricated items like pressure vessels, heat exchangers and HVAC ducting?

These are the kind of items QuickTakeoff is designed for: fabricated equipment and assemblies whose drawings and specifications are furnished in the tender. Pressure vessels and heat exchangers in oil and gas, and ducting in HVAC, are typical examples.

What is material optimisation?

Material optimisation estimates the material actually needed and plans cutting and nesting so scrap and wastage stay low. In a tender, this helps bidders price raw material more accurately and avoid paying for waste.

Which cost heads does QuickTakeoff cover?

It covers raw materials, labour, scrap and wastage, manufacturing, fabrication and other project costs, so each bid is priced from structured, optimised quantities.

Why is BOQ preparation so time-consuming?

BOQ preparation means interpreting many drawing sheets, measuring each component, applying specifications and rates, and checking for missed items, often by hand in PDF or AutoCAD. Complex drawings and tight bid deadlines make it slow.

When will QuickTakeoff be available?

QuickTakeoff is in development and listed as coming soon. Bid teams can join the early-access list to be told when it is ready.

How do I get early access?

Join the early-access list on the QuickTakeoff page with your name, business email, company name and industry, or contact QuickBid at +91 9112567888 or support@quickbid.co.in.

06
Tags:quantity takeoff softwareAI quantity takeoffBOQ softwareBOM software
All articles
FROM OUR BLOG

Articles & insights

All articles
GET STARTED

Let's talk about your workflows

Book a discovery call or send us a message.
We’ll get back to you within one business day.

30 minutes to walk through how your team bids or procures today. No pitch, no pressure—just a focused conversation about your tender workflow.

  • See where AI can save your team the most time
  • See QuickBid on tenders from your industry
  • Get a recommended product and setup

Schedule a discovery call

Tell us about your goals, and we’ll tailor our expertise to fit your needs. Fill out the form below, and we’ll get back to you soon.

Select

We'll only use your info to respond to your inquiry.